Location: Chase City, Virginia
Estimate: $21,000,000
Timeline: November 2018-July 2019
Description: Construction of a 960 Acre solar farm for Dominion Energy. Construction included erosion control, clearing and grubbing, 1.3 mil cy of site grading, interim and permanent drainage structures, grassing and restoration, and trenching and backfill efforts in support of the electrical work scope.
Location: Spirit Lake, Idaho
Estimate: $1,200,000
Timeline: August 2021-Janurary 2022
Description: Construction of a new 550,000 gal water storage tank including structural over excavation and backfill, city utility tie in, storm drainage piping and electrical work.
Location: Soda Springs, Idaho
Estimate: Undisclosed
Timeline: May 2021-Present
Earthworks related to completion of haul road construction, associated ponds, rail rough grading with sub-ballast and completion of the facility pad development.
Location: Morrow County
Estimate: $7,000,000
Timeline: March 2020-Feburary 2021 Description: Excavation, grading, concrete placement, rebar installation-16 turbines foundations, 8000 CY Concrete, 758 tons of rebar, 4.5 miles of road/crane path.
Location: Louisa, Virginia
Estimate: $23,000,000
Timeline: January 2020- May 2021
Description: Site work for a 709 acre solar field. Moving 1.5 million cy in cut/fill. Construction of 30 retention ponds and outlet structures.
Location: Undisclosed
Estimate: Undisclosed
Timeline: 2014 - Present
Description: Sitework, site concrete, concrete foundations, and tilt-up construction.
Location: Lakeview, Oregon
Estimate: $19,000,000
Timeline: 2018 - 2020
Description: Sitework, concrete pads and foundation for new bio fuels plant. The plant converts approximately 166,000 dry tons of waste woody biomass into 16.1 million gallons/year of low-carbon, renewable jet and diesel fuels.
Location: Williston, North Dakota
Estimate: $4,500,000
Timeline: June 2020 - September 2020
Description: Sanderson was two projects, the main Greenfield Gas Plant and a separate Slug Catcher. Work included footing, slab on grade, drilled pier excavation, and backfill.
Location: Prosser, Washington
Estimate: $450,000
Timeline: August 2021-September 2021
Description: Demolition of existing wood hanger, sub-grade/aggregate and paving for new taxi-lane for future hanger construction.
Location: Nashville, Kansas
Estimate: $13,000,000
Timeline: June 2020-July 2021
Description: Site development for 62 wind turbine project. Grading, aggregate placement- 62 turbine laydown areas, 17.5 miles of road/crane path, 70,000 TN rock.
Location: Hermiston, Oregon
Estimate: $1,474,216
Timeline: March 2022-May 2022
Description: Removal of existing aircraft tiedowns, installation of new storm drainage, and repaving of taxiways.